apm_parameter_sync (public)

 apm_parameter_sync package_key package_id

Defined in packages/acs-tcl/tcl/apm-procs.tcl

Syncs the parameters in the database with the memory cache. This must be called after creating a new package instance.

Parameters:
package_key (required)
package_id (required)

Partial Call Graph (max 5 caller/called nodes):
ad_parameter_cache ad_parameter_cache (public) db_list_of_lists db_list_of_lists (public) apm_parameter_sync apm_parameter_sync apm_parameter_sync->ad_parameter_cache apm_parameter_sync->db_list_of_lists

Testcases:
No testcase defined.
[ show source ]
Show another procedure: